How to construct floor heating module
As an efficient and energy-saving heating method, floor heating modules have been favored by more and more families in recent years. This article will introduce in detail the construction steps, precautions and FAQs of floor heating modules to help you better understand the installation process of floor heating modules.
1. Construction steps of floor heating module

The construction of floor heating modules mainly includes the following steps:
| steps | content |
|---|---|
| 1. Ground cleaning | Make sure the floor is flat, clean and free of debris and unevenness. |
| 2. Lay insulation layer | Lay insulation boards to reduce heat loss downwards. |
| 3. Install floor heating module | Lay the floor heating modules according to the design drawings to ensure tight connections between modules. |
| 4. Lay reflective film | Lay reflective film on the insulation layer to improve heat reflection efficiency. |
| 5. Install pipes | Embed floor heating pipes into the modules to ensure even distribution of pipes. |
| 6. Stress testing | Pressure test the pipes to ensure there are no leaks. |
| 7. Pouring concrete | Pour a concrete protective layer on the pipe, with a thickness of generally 3-5cm. |
| 8. Floor decoration | After the concrete is dry, finish the floor (such as laying flooring or tiles). |
2. Things to note when constructing floor heating modules
During the construction process of floor heating modules, you need to pay attention to the following points:
| Things to note | Description |
|---|---|
| 1. Floor flatness | Uneven ground will affect the laying effect of the insulation layer and modules. |
| 2. Module connection | Modules must be tightly connected to avoid heat loss. |
| 3. Pipe spacing | The spacing between pipes should be based on the requirements of the design drawings, generally 15-20cm. |
| 4. Stress testing | Pressure testing must be performed rigorously to ensure there are no leaks in the pipeline. |
| 5. Concrete protective layer | The thickness of the concrete protective layer should be uniform to avoid cracking. |
3. Answers to frequently asked questions about floor heating module construction
The following are common questions and answers during floor heating module construction:
| question | Answer |
|---|---|
| 1. How long does it take to construct the floor heating module? | It usually takes 3-5 days, depending on the construction area and complexity. |
| 2. How long does it take for the floor heating module to be put into use after construction? | The concrete protective layer needs 7-10 days to dry, and then it can be gradually heated up for use. |
| 3. How much does it cost to construct a floor heating module? | The cost varies depending on the region and material, but is generally 100-200 yuan per square meter. |
| 4. How to maintain the floor heating module after construction? | Avoid drilling holes in the ground or hitting with heavy objects, and check pipe pressure regularly. |
4. Summary
The construction of floor heating modules is a highly technical work, and it is necessary to strictly follow the construction steps and precautions. Through the introduction of this article, I believe you will have a deeper understanding of the construction of floor heating modules. If you have more questions, it is recommended to consult a professional floor heating construction team to ensure construction quality and effect.
check the details
check the details